Initially, represented Ishikawajima-Harima Heavy Industries Co., Ltd. in connection with prequalification and contract negotiations for the San Francisco Bay Bridge Project's Eastern Span. Subsequently represented Candraft-Tensor, a joint venture that detailed the Eastern Span’s structural steel.